The final Saturn V, AS-512, before the launch of Apollo 17 |
|
Function | Manned LEO and Lunar launch vehicle |
---|---|
Manufacturer | Boeing (S-IC) North American (S-II) Douglas (S-IVB) |
Country of origin | United States |
Size | |
Height | 363.0 feet (110.6 m) |
Diameter | 33.0 feet (10.1 m) |
Mass | 6,699,000 pounds (3,039,000 kg) |
Stages | 3 |
Capacity | |
Payload to LEO | 262,000 pounds (119,000 kg) |
Payload to TLI |
(100,000 pounds (45,000 kg)) |
Associated rockets | |
Family | Saturn |
Derivatives | Saturn INT-21 |
Comparable | N1 rocket |
Launch history | |
Status | Decommissioned |
Launch sites | LC-39, Kennedy Space Center |
Total launches | 13 (including INT-21)[1] |
Successes | 11 |
Failures | 0 |
Partial failures | 2 (Apollo 6 and Apollo 13) |
Maiden flight | November 9, 1967 (SA-501) |
Last flight | December 6, 1972 (May 14, 1973 - INT-21)[1] |
First Stage - S-IC | |
Length | 138.0 feet (42.1 m) |
Diameter | 33.0 feet (10.1 m) |
Empty mass | 288,000 pounds (131,000 kg) |
Gross Mass | 5,000,000 pounds (2,300,000 kg) |
Engines | 5 Rocketdyne F-1 |
Thrust | 7,648,000 pounds-force (34,020,000 N) |
Specific impulse | 263 sec (2580 N-s/kg) |
Burn time | 150 seconds |
Fuel | RP-1/LOX |
Second Stage - S-II | |
Length | 81.5 feet (24.8 m) |
Diameter | 33.0 feet (10.1 m) |
Empty mass | 80,000 pounds (36,000 kg) |
Gross Mass | 1,060,000 pounds (480,000 kg) |
Engines | 5 Rocketdyne J-2 |
Thrust | 1,000,000 pounds-force (4,400,000 N) |
Specific impulse | 421 sec (4130 N-s/kg) |
Burn time | 360 seconds |
Fuel | LH2/LOX |
Third Stage - S-IVB | |
Length | 61.6 feet (18.8 m) |
Diameter | 21.7 feet (6.6 m) |
Empty mass | 23,000 pounds (10,000 kg) |
Gross Mass | 266,400 pounds (120,800 kg) |
Engines | 1 Rocketdyne J-2 |
Thrust | 225,000 pounds-force (1,000,000 N) |
Specific impulse | 421 sec (4130 N-s/kg) |
Burn time | 165 + 335 seconds (2 burns) |
Fuel | LH2/LOX |
The Saturn V (pronounced "Saturn Five") was an American human-rated expendable rocket used by NASA's Apollo and Skylab programs from 1967 until 1973. A multistage liquid-fueled launch vehicle, NASA launched 13 Saturn Vs from the Kennedy Space Center, Florida with no loss of crew or payload. It remains the tallest, heaviest and most powerful rocket ever brought to operational status and still holds the record for the heaviest launch vehicle payload.
The largest production model of the Saturn family of rockets, the Saturn V was designed under the direction of Wernher von Braun and Arthur Rudolph at the Marshall Space Flight Center in Huntsville, Alabama, with Boeing, North American Aviation, Douglas Aircraft Company, and IBM as the lead contractors. Von Braun's design was based in part on his work on the Aggregate series of rockets, especially the A-10, A-11, and A-12, in Germany during World War II.
To date, the Saturn V is the only launch vehicle to transport human beings beyond Low Earth Orbit. A total of 24 men were flown out to the Moon in the four years spanning December 1968 through December 1972.
Contents |
The origins of the Saturn V rocket begin with the US government choosing Wernher von Braun to be one of about seven hundred German scientists in Operation Paperclip, a program created by President Truman in September 1946.[2] It was intended to bring these scientists and their expertise to the United States, thereby giving America an edge in the Cold War. To legally bring over scientists who had been active in the Nazi Party, members of the War Department's Joint Intelligence Objectives Agency doctored dossiers, including von Braun's, to downplay their Nazi sympathies.[2]
Von Braun was put into the rocket design division of the Army due to his direct involvement in the creation of the V-2 rocket.[3] Between 1945 and 1958, his work was restricted to conveying the ideas and methods behind the V-2 to the American engineers.[2] Despite Von Braun's many articles on the future of space rocketry, the US Government continued funding Air Force and Naval rocket programs to test their Vanguard missiles despite numerous costly failures. It was not until the 1957 Soviet launch of Sputnik that the Army and the government started taking serious steps towards putting Americans in space.[4] Finally, they turned to von Braun and his team, who during these years created and experimented with the Jupiter series of rockets. The Juno I was the rocket that launched the first American satellite in January 1958, and part of the last ditch plan for NASA to get its foot in the Space Race.[5] The Jupiter series was one more step in von Braun's journey to the Saturn V, later calling that first series "an infant Saturn".[4]
The Saturn V's design stemmed from the designs of the V-2 and Jupiter series rockets. As the success of the Jupiter series became evident, the Saturn series emerged.
Between 1960 and 1962, the Marshall Space Flight Center (MSFC) designed a series of Saturn rockets that could be used for various Earth orbit or lunar missions.
The C-1 was developed into the Saturn I, and the C-2 rocket was dropped early in the design process in favor of the C-3, which was intended to use two F-1 engines on its first stage, four J-2 engines for its second stage, and an S-IV stage, using six RL-10 engines.
NASA planned to use the C-3 as part of the Earth Orbit Rendezvous (EOR) concept, with at least four or five launches needed for a single lunar mission. But MSFC was already planning an even bigger rocket, the C-4, which would use four F-1 engines on its first stage, an enlarged C-3 second stage, and the S-IVB, a stage with a single J-2 engine, as its third stage. The C-4 would need only two launches to carry out an EOR lunar mission.
On January 10, 1962, NASA announced plans to build the C-5. The three-stage rocket would consist of five F-1 engines for the first stage, five J-2 engines for the second stage, and a single, additional J-2 engine for the third stage.[6] The C-5 was designed for the higher payload capacity necessary for a lunar mission, and could carry up to 90,000 pounds (41,000 kg) to the Moon.[6]
The C-5 would undergo component testing even before the first model was constructed. The rocket's third stage would be utilized as the second stage for the C-IB, which would serve both to demonstrate proof of concept and feasibility for the C-5, but would also provide flight data critical to the continued development of the C-5.[6] Rather than undergoing testing for each major component, the C-5 would be tested in an "all-up" fashion, meaning that the first test flight of the rocket would include complete versions of all three stages. By testing all components at once, far fewer test flights would be required before a manned launch.[7]
The C-5 was confirmed as NASA's choice for the Apollo Program in early 1963, and was given a new name—the Saturn V.[6]
The C-1 became the Saturn I, and C-1B became Saturn IB. Von Braun headed a team at the Marshall Space Flight Center in building a vehicle capable of launching a crewed spacecraft on a trajectory to the moon.[4] Before they moved under NASA's jurisdiction, von Braun's team had already begun work on improving the thrust, creating a less complex operating system, and designing better mechanical systems.[4] It was during these revisions that the decision to reject the single engine of the V-2's design came about, and the team moved to a multiple-engine design. The Saturn I and IB reflected these changes, but still did not have the potential to send a crewed spacecraft to the moon.[4] These designs, however, provided a basis for which NASA could determine its best method towards landing a man on the moon.
The Saturn V's final design had several key design features. Engineers determined that the best engines were the F-1s coupled with the new liquid hydrogen propulsion system called J-2, which made the Saturn C-5 configuration optimal.[4] By 1962, NASA had finalized its plans to proceed with von Braun's Saturn designs, and the Apollo space program gained speed.[8]
With the configuration finalized, NASA turned its attention to mission profiles. Despite some controversy, a lunar orbit rendezvous for the lunar module was chosen over an Earth orbital rendezvous.[4] Issues such as type of fuel injections, the needed amount of fuel for such a trip, and rocket manufacturing processes were ironed out, and the designs for the Saturn V were selected. The rocket was to be built in three sections from the bottom up: SI-C, S-II, and S-IVB. Each section was designed by von Braun in Huntsville and built by outside contractors such as Boeing, North American Aviation, Douglas Aircraft, and IBM.[8]
Early in the planning process, NASA considered three leading ideas for the Moon mission: Earth Orbit Rendezvous, Direct Ascent, and Lunar Orbit Rendezvous (LOR). A direct ascent configuration would launch a larger rocket which would land directly on the lunar surface, while an Earth orbit rendezvous would launch two smaller spacecraft which would combine in Earth orbit. A LOR mission would involve a single rocket launching a single spacecraft, but only a small part of that spacecraft would land on the moon. That smaller landing module would then rendezvous with the main spacecraft, and the crew would return home.[9]
NASA at first dismissed LOR as a riskier option, given that an orbital rendezvous had yet to be performed in Earth orbit, much less in lunar orbit. Several NASA officials, including Langley Research Center engineer John Houbolt and NASA Administrator George Low, argued that a Lunar Orbit Rendezvous provided the simplest landing on the moon, the most cost–efficient launch vehicle and, perhaps most importantly, the best chance to accomplish a lunar landing within the decade.[6] Other NASA officials were convinced, and LOR was officially selected as the mission configuration for the Apollo program on 7 November 1962.[6]
The Saturn V's huge size and payload capacity dwarfed all other previous rockets which had successfully flown at that time. With the Apollo spacecraft on top it stood 363 feet (111 m) tall and without fins it was 33 feet (10 m) in diameter. Fully fueled it had a total mass of 6.5 million pounds (3,000 metric tons) and a payload capacity of 260,000 pounds (120,000 kg) to LEO. Comparatively, at 363 feet (111 m), the Saturn V is about 58 feet taller than the Statue of liberty from the ground to the torch, and is just one foot shorter than St Paul's Cathedral in London, and only cleared the doors of the Vehicle Assembly Building (VAB) by 6 feet (1.8 m) when rolled out.
In contrast, the Mercury-Redstone Launch Vehicle used on Freedom 7, the first manned American spaceflight, was just under 11 feet (3.4 m) longer than the S-IVB stage, and delivered less sea level thrust (78,000 pounds-force (350 kN)) than the Launch Escape System rocket (147,000 pounds-force (650 kN) sea level thrust) mounted atop the Apollo command module.[10]
The Saturn V was principally designed by the Marshall Space Flight Center in Huntsville, Alabama, although numerous major systems, including propulsion, were designed by subcontractors. It used the powerful new F-1 and J-2 rocket engines for propulsion. When tested, these engines shattered the windows of nearby houses.[11] Designers decided early on to attempt to use as much technology from the Saturn I program as possible. Consequently, the S-IVB-500 third stage of the Saturn V was based on the S-IVB-200 second stage of the Saturn IB. The Instrument Unit that controlled the Saturn V shared characteristics with that carried by the Saturn IB.
Blueprints and other Saturn V plans are available on microfilm at the Marshall Space Flight Center.[12]
The Saturn V consisted of three stages—the S-IC first stage, S-II second stage and the S-IVB third stage—and the instrument unit. All three stages used liquid oxygen (LOX) as an oxidizer. The first stage used RP-1 for fuel, while the second and third stages used liquid hydrogen (LH2). The upper stages also used small solid-fueled ullage motors that helped to separate the stages during the launch, and to ensure that the liquid propellants were in a proper position to be drawn into the pumps.
The S-IC was built by The Boeing Company at the Michoud Assembly Facility, New Orleans, where Space Shuttle External Tanks would later be built. Most of its mass of over two thousand metric tonnes at launch was propellant, in this case RP-1 rocket fuel and liquid oxygen oxidizer. It was 42 metres (138 ft) tall and 10 metres (33 ft) in diameter, and provided over 34 meganewtons (7,600,000 lbf) of thrust to get the rocket through the first 67 kilometres (220,000 ft) of ascent. The S-IC stage had a dry weight of about 131,000 kilograms (290,000 lb) and fully fueled at launch had a total weight of 2,300 tonnes (5,100,000 lb). The five F-1 engines were arranged in a cross pattern. The center engine was fixed, while the four outer engines could be hydraulically turned ("gimballed") to control the rocket. In flight, the center engine was turned off about 26 seconds earlier than the outboard engines to limit acceleration. During launch, the S-IC fired its engines for 168 seconds (ignition occurred about 7 seconds before liftoff) and at engine cutoff, the vehicle was at an altitude of about 67 kilometres (220,000 ft), was downrange about 93 kilometres (58 mi), and was moving about 2,300 metres per second (7,500 ft/s).[13]
The S-II was built by North American Aviation at Seal Beach, California. Using liquid hydrogen and liquid oxygen, it had five J-2 engines in a similar arrangement to the S-IC, also using the outer engines for control. The S-II was 81 feet 7 inches (24.87 m) tall with a diameter of 33 feet (10 m), identical to the S-IC, and thus was the largest cryogenic stage until the launch of the STS. The S-II had a dry weight of about 80,000 pounds (36,000 kg) and fully fueled, weighed 1,060,000 pounds (480,000 kg). The second stage accelerated the Saturn V through the upper atmosphere with 5.1 meganewtons (1,100,000 lbf) of thrust (in vacuum). When loaded, significantly more than 90 percent of the mass of the stage was propellant; however, the ultra-lightweight design had led to two failures in structural testing. Instead of having an intertank structure to separate the two fuel tanks as was done in the S-IC, the S-II used a common bulkhead that was constructed from both the top of the LOX tank and bottom of the LH2 tank. It consisted of two aluminum sheets separated by a honeycomb structure made of phenolic resin. This bulkhead had to insulate against the 70 °C (158 °F) temperature difference between the two tanks. The use of a common bulkhead saved 3.6 tonnes (7,900 lb). Like the S-IC, the S-II was transported by sea.
The S-IVB was built by the Douglas Aircraft Company at Huntington Beach, California. It had one J-2 engine and used the same fuel as the S-II. The S-IVB used a common bulkhead to insulate the two tanks. It was 58 feet 7 inches (17.86 m) tall with a diameter of 21 feet 8 inches (6.604 m) and was also designed with high mass efficiency, though not quite as aggressively as the S-II. The S-IVB had a dry weight of about 23,000 pounds (10,000 kg) and, fully fueled, weighed about 262,000 pounds (119,000 kg).[14]
The S-IVB-500 model used on the Saturn V differed from the S-IVB-200 used as the second stage of the Saturn IB, in that the engine was restartable once per mission. This was necessary as the stage would be used twice during a lunar mission: first in a 2.5 min burn for the orbit insertion after second stage cutoff, and later for the trans-lunar injection (TLI) burn, lasting about 6 min. Two liquid-fueled Auxiliary Propulsion System (APS) units mounted at the aft end of the stage were used for attitude control during the parking orbit and the trans-lunar phases of the mission. The two APSs were also used as ullage engines to settle the propellants in the aft tank engine feed lines prior to the trans-lunar injection burn.
The S-IVB was the only rocket stage of the Saturn V small enough to be transported by plane, in this case the Pregnant Guppy.
The Instrument Unit was built by IBM and rode atop the third stage. It was constructed at the Space Systems Center in Huntsville. This computer controlled the operations of the rocket from just before liftoff until the S-IVB was discarded. It included guidance and telemetry systems for the rocket. By measuring the acceleration and vehicle attitude, it could calculate the position and velocity of the rocket and correct for any deviations.
In the event of an abort requiring the destruction of the rocket, the range safety officer would remotely shut down the engines and after several seconds send another command for the shaped explosive charges attached to the outer surfaces of the rocket to detonate. These would make cuts in fuel and oxidizer tanks to disperse the fuel quickly and to minimize mixing. The pause between these actions would give time for the crew to escape using the Launch Escape Tower or (in the later stages of the flight) the propulsion system of the Service module. A third command, "safe", was used after the S-IVB stage reached orbit to irreversibly deactivate the self-destruct system. The system was also inactive as long as the rocket was still on the launch pad.[15]
The Soviet counterpart of the Saturn V was the N-1 rocket. The Saturn V was taller, heavier and had greater payload capacity,[16] while the N-1 had more liftoff thrust and a larger first stage diameter.[17] The N1 never became operational; four test launches each resulted in catastrophic vehicle failure early in flight, and the program was canceled. The first stage of Saturn V used five powerful engines rather than the 30 smaller engines of the N-1. During two launches, Apollo 6 and Apollo 13, the Saturn V was able to recover from engine loss incidents. The N-1 likewise was designed to compensate for engine loss, but the system never successfully saved a launch from failure.
The three-stage Saturn V had a peak thrust of at least 7,650,000 pounds-force (34.02 MN) (SA-510 and subsequent)[18] and a lift capacity of 118,000 kg to LEO. The SA-510 mission (Apollo 15) had a liftoff thrust of 7,823,000 pounds-force (34.80 MN). The SA-513 mission (Skylab) had slightly greater liftoff thrust of 7,891,000 pounds-force (35.10 MN). By comparison, the N-1 had a sea-level liftoff thrust of about 9,900,000 pounds-force (44 MN). No other operational launch vehicle has ever surpassed the Saturn V in height, weight, or payload capability. The closest contenders were the US Space Shuttle and the Soviet Energia.
The Space Shuttle generated a peak thrust of 30.1 meganewtons (6,800,000 lbf),[19] and payload capacity to LEO (excluding the Orbiter itself) was 28,800 kilograms (63,000 lb), which was about 25 percent of the Saturn V's payload. Total mass in orbit, including the Orbiter, was about 112,000 kilograms (250,000 lb), compared to the Apollo 15 total orbital mass of the S-IVB third stage and Apollo spacecraft, of 140,976 kilograms (310,800 lb).
Energia had the same liftoff thrust as SA-513, 7,900,000 pounds-force (35.1 MN). The Energia had two test flights: one failure in 1987, and one successful launch of an unmanned Buran shuttle to orbit in 1988. The Energia and Buran programs were cancelled in 1993. Hypothetical future versions might have been significantly more powerful than the Saturn V, delivering 46 meganewtons (10,000,000 lbf) of thrust and able to deliver up to 175 tonnes (390,000 lb) to LEO in the "Vulkan" configuration. Planned uprated versions of the Saturn V using F-1A engines would have had about 18 percent more thrust and 137,250 kilograms (302,600 lb) payload.[20] NASA contemplated building larger members of the Saturn family, such as the Saturn C-8, and also unrelated rockets, such as Nova, but these were never produced.
Some other recent launch vehicles have a small fraction of the Saturn V's payload capacity: the European Ariane 5 with the newest versions Ariane 5 ECA delivers up to 10,000 kg to geostationary transfer orbit (GTO). The US Delta 4 Heavy, which launched a dummy satellite on December 21, 2004, has a capacity of 13,100 kg to geosynchronous transfer orbit. The yet to be flown Atlas V Heavy (using engines based on a Russian design) delivers up to 29,400 kg to LEO and 8,900 kg to GTO.
Because of its large size, attention is often focused on the S-IC thrust and how this compares to other large rockets. However, several factors make such comparisons more complex than first appears:
Without knowing the exact measurement technique and mathematical method used to determine thrust for each different rocket, comparisons are often inexact. As the above shows, the specified thrust often differs significantly from actual flight thrust calculated from direct measurements. The thrust stated in various references is often not adequately qualified as to vacuum vs sea level, or peak vs average thrust.
Similarly, payload increases are often achieved in later missions independent of engine thrust. This is by weight reduction or trajectory reshaping.
The result is there is no single absolute figure for engine thrust, stage thrust or vehicle payload. There are specified values and actual flight values, and various ways of measuring and deriving those actual flight values.
The performance of each Saturn V launch was extensively analyzed and a Launch Evaluation Report produced for each mission, including a thrust/time graph for each vehicle stage on each mission.[21]
After the construction and ground testing of a stage was completed, it was then shipped to the Kennedy Space Center. The first two stages were so large that the only way to transport them was by barge. The S-IC, constructed in New Orleans, was transported down the Mississippi River to the Gulf of Mexico. After rounding Florida, it was then transported up the Intra-Coastal Waterway to the Vertical Assembly Building (now called the Vehicle Assembly Building). This is in essence the same route which was used by NASA to ship Space Shuttle External Tanks. The S-II was constructed in California and so traveled via the Panama Canal. The third stage and Instrument Unit could be carried by the Aero Spacelines Pregnant Guppy and Super Guppy, but could also have been carried by barge if warranted.
On arrival at the Vertical Assembly Building, each stage was checked out in a horizontal position before being moved to a vertical position. NASA also constructed large spool-shaped structures that could be used in place of stages if a particular stage was late. These spools had the same height and mass and contained the same electrical connections as the actual stages.
NASA stacked or assembled the Saturn V on a Mobile Launcher Platform (MLP), which consisted of a Launch Umbilical Tower (LUT) with nine swing arms (including the crew access arm), a "hammerhead" crane, and a water suppression system which was activated prior to launch. After assembly was completed, the entire stack was moved from the VAB to the launch pad using the Crawler Transporter (CT). Built by the Marion Power Shovel company (and later used for transporting the smaller and lighter Space Shuttle), the CT ran on four double-tracked treads, each with 57 'shoes'. Each shoe weighed 900 kg (2,000 lb). This transporter was also required to keep the rocket level as it traveled the 3 miles (4.8 km) to the launch site, especially at the 3 percent grade encountered at the launch pad. The CT also carried the Mobile Service Structure (MSS), which allowed technicians access to the rocket until eight hours before launch, when it was moved to the "halfway" point on the Crawlerway (the junction between the VAB and the two launch pads).
The Saturn V carried all Apollo lunar missions. All Saturn V missions launched from Launch Complex 39 at the John F. Kennedy Space Center. After the rocket cleared the launch tower, flight control transferred to Johnson Space Center's Mission Control in Houston, Texas.
An average mission used the rocket for a total of just 20 minutes. Although Apollo 6 and Apollo 13 experienced engine failures, the onboard computers were able to compensate by burning the remaining engines longer, and none of the Apollo launches resulted in a payload loss.
The first stage burned for about 2 minutes and 41 seconds, lifting the rocket to an altitude of 42 miles (68 km) and a speed of 6,164 miles per hour (2,756 m/s) and burning 4,700,000 pounds (2,100,000 kg) of propellant.[22]
At 8.9 seconds before launch, the first stage ignition sequence started. The center engine ignited first, followed by opposing outboard pairs at 300-millisecond intervals to reduce the structural loads on the rocket. When thrust had been confirmed by the onboard computers, the rocket was "soft-released" in two stages: first, the hold-down arms released the rocket, and second, as the rocket began to accelerate upwards, it was slowed by tapered metal pins pulled through dies for half a second. Once the rocket had lifted off, it could not safely settle back down onto the pad if the engines failed. And it should be noted that this was considered by the Apollo astronauts as one of the most tense moments in riding the Saturn V, for if the rocket did fail to liftoff after release they would have the lowest chances of surviving a failed launch, given the great amount of hydrogen propellant in the rocket and the launch pad, that if a fully fueled Saturn V exploded on the pad, it would've had the force of a low-yield nuclear bomb, and it would be near impossible to clear the blast using the Launch Escape System.
It took about 12 seconds for the rocket to clear the tower. During this time, it yawed 1.25 degrees away from the tower to ensure adequate clearance despite adverse winds. (This yaw, although small, can be seen in launch photos taken from the east or west.) At an altitude of 430 feet (130 m) the rocket rolled to the correct flight azimuth and then gradually pitched down until 38 seconds after second stage ignition. This pitch program was set according to the prevailing winds during the launch month. The four outboard engines also tilted toward the outside so that in the event of a premature outboard engine shutdown the remaining engines would thrust through the rocket's center of gravity. The Saturn V reached 400 feet per second (120 m/s) at over 1 mile (1,600 m) in altitude. Much of the early portion of the flight was spent gaining altitude, with the required velocity coming later. The Saturn V broke the sound barrier at just over 1 minute at an altitude of between 3 and 4 nautical miles. At this point, shock collars, or condensation clouds, could be seen forming around the bottom of the command module and around the top of the second stage.
At about 80 seconds, the rocket experienced maximum dynamic pressure (max Q). The dynamic pressure on a rocket varies with air density and the square of relative velocity. Although velocity continues to increase, air density decreases so quickly with altitude that dynamic pressure falls below max Q.
Acceleration increased during S-IC flight for two reasons: decreasing propellant mass, and increasing thrust as F-1 engine efficiency improved in the thinner air at altitude. At 135 seconds, the inboard (center) engine shut down to limit acceleration to 4 g (39.2 m/s2). The other engines continued to burn until either oxidizer or fuel depletion is detected by sensors in the suction assemblies. First stage separation was a little less than one second after cutoff to allow for F-1 thrust tail-off. Eight small solid fuel separation motors backed the S-IC from the interstage at an altitude of about 67 kilometers (42 mi). The first stage continued ballistically to an altitude of about 109 kilometers (68 mi) and then fell in the Atlantic Ocean about 560 kilometers (350 mi) downrange.
After S-IC separation, the S-II second stage burned for 6 minutes and propelled the craft to 109 miles (175 km) and 15,647 mph (25,182 km/h– 7.00 km/s), close to orbital velocity.
For the first two unmanned launches, eight solid-fuel ullage motors ignited for four seconds to give positive acceleration to the S-II stage, followed by start of the five J-2 engines. For the first seven manned Apollo missions only four ullage motors were used on the S-II, and they were eliminated completely for the final four launches. About 30 seconds after first stage separation, the interstage ring dropped from the second stage. This was done with an inertially fixed attitude so that the interstage, only 1 meter from the outboard J-2 engines, would fall cleanly without contacting them. Shortly after interstage separation the Launch Escape System was also jettisoned. See Apollo abort modes for more information about the various abort modes that could have been used during a launch.
About 38 seconds after the second stage ignition the Saturn V switched from a preprogrammed trajectory to a "closed loop" or Iterative Guidance Mode. The Instrument Unit now computed in real time the most fuel-efficient trajectory toward its target orbit. If the Instrument Unit failed, the crew could switch control of the Saturn to the Command Module's computer, take manual control, or abort the flight.
About 90 seconds before the second stage cutoff, the center engine shut down to reduce longitudinal pogo oscillations. At around this time, the LOX flow rate decreased, changing the mix ratio of the two propellants, ensuring that there would be as little propellant as possible left in the tanks at the end of second stage flight. This was done at a predetermined delta-v.
Five level sensors in the bottom of each S-II propellant tank were armed during S-II flight, allowing any two to trigger S-II cutoff and staging when they were uncovered. One second after the second stage cut off it separated and several seconds later the third stage ignited. Solid fuel retro-rockets mounted on the interstage at the top of the S-II fired to back it away from the S-IVB. The S-II impacted about 4,200 km (2,600 mi) from the launch site.
On the Apollo 13 mission, the inboard engine suffered from major pogo oscillation, resulting in an early automatic cutoff. To ensure sufficient velocity was reached, the remaining four engines were kept active for longer than planned. A pogo suppressor was fitted to later Apollo missions to avoid this, though the early engine 5 cutoff remained to reduce G-forces.
Unlike the two-plane separation of the S-IC and S-II, the S-II and S-IVB stages separated with a single step. Although it was constructed as part of the third stage, the interstage remained attached to the second stage.
During Apollo 11, a typical lunar mission, the third stage burned for about 2.5 minutes until first cutoff at 11 minutes 40 seconds. At this point it was 1,640 miles (2,640 km) downrange and in a parking orbit at an altitude of 118.8 miles (191.2 km) and velocity of 17,432 mph. The third stage remained attached to the spacecraft while it orbited the Earth two and a half times while astronauts and mission controllers prepared for translunar injection (TLI).
This parking orbit was quite low by Earth orbit standards, and it would have been short-lived due to aerodynamic drag. This was not a problem on a lunar mission because of the short stay in the parking orbit. The S-IVB also continued to thrust at a low level by venting gaseous hydrogen, to keep propellants settled in their tanks and prevent gaseous cavities from forming in propellant feed lines. This venting also maintained safe pressures as liquid hydrogen boiled off in the fuel tank. This venting thrust easily exceeded aerodynamic drag.
For the final three Apollo flights, the temporary parking orbit was even lower (approximately 172 kilometers (107 mi)), to increase payload for these missions. The Apollo 9 Earth orbit mission was launched into the nominal orbit consistent with Apollo 11, but the spacecraft were able to use their own engines to raise the perigee high enough to sustain the 10-day mission. The Skylab was launched into a quite different orbit, with a 434-kilometer (270 mi) perigee which sustained it for six years, and also a higher inclination to the equator (50 degrees versus 32.5 degrees for Apollo).
On Apollo 11, TLI came at 2 hours and 44 minutes after launch. The S-IVB burned for almost six minutes giving the spacecraft a velocity close to the Earth's escape velocity of 11.2 km/s (40,320 km/h; 25,053 mph). This gave an energy-efficient transfer to lunar orbit with the moon helping to capture the spacecraft with a minimum of CSM fuel consumption.
About 40 minutes after TLI the Apollo Command Service Module (CSM) separated from the third stage, turned 180 degrees and docked with the Lunar Module (LM) that rode below the CSM during launch. The CSM and LM separated from the spent third stage 50 minutes later.
If it were to remain on the same trajectory as the spacecraft, the S-IVB could have presented a collision hazard so its remaining propellants were vented and the auxiliary propulsion system fired to move it away. For lunar missions before Apollo 13, the S-IVB was directed toward the moon's trailing edge in its orbit so that the moon would slingshot it beyond earth escape velocity and into solar orbit. From Apollo 13 onwards, controllers directed the S-IVB to hit the Moon.[23] Seismometers left behind by previous missions detected the impacts, and the information helped map the inside of the Moon.
Apollo 9 was a special case; although it was an earth orbital mission, after spacecraft separation its S-IVB was fired out of earth orbit into a solar orbit.
On September 3, 2002, astronomer Bill Yeung discovered a suspected asteroid, which was given the discovery designation J002E3. It appeared to be in orbit around the Earth, and was soon discovered from spectral analysis to be covered in white titanium dioxide paint, the same paint used for the Saturn V. Calculation of orbital parameters identified the apparent asteroid as being the Apollo 12 S-IVB stage. Mission controllers had planned to send Apollo 12's S-IVB into solar orbit, but the burn after separating from the Apollo spacecraft lasted too long, and hence it did not pass close enough to the Moon, remaining in a barely stable orbit around the Earth and Moon. In 1971, through a series of gravitational perturbations, it is believed to have entered in a solar orbit and then returned into weakly captured Earth orbit 31 years later. It left Earth orbit again in June 2003. Another near-earth object, discovered in 2006 and designated 6Q0B44E, may also be part of an Apollo spacecraft.
In 1968, the Apollo Applications Program was created to look into science missions that could be performed with the surplus Apollo hardware. Much of the planning centered on the idea of a space station, which eventually spawned the Skylab program. Skylab was launched using a two-stage Saturn V, sometimes called a Saturn INT-21.[1] It was the only launch not directly related to the Apollo lunar landing program. The only significant changes to the Saturn V from the Apollo configurations involved some modification to the S-II to act as the terminal stage for inserting the Skylab payload into earth orbit, and to vent excess propellent after engine cutoff so the spent stage would not rupture in orbit. The S-II remained in orbit for almost two years, and made an uncontrolled re-entry on January 11, 1975.
Originally it was planned to use a 'wet workshop' concept, with a rocket stage being launched into orbit by a Saturn 1B and its spent S-IVB outfitted in space, but this was abandoned for the 'dry workshop' concept: An S-IVB stage from a Saturn IB was converted into a space station on the ground and launched on a Saturn V. A backup, constructed from a Saturn V third stage, is now on display at the National Air and Space Museum.
Three crews lived aboard Skylab from May 25, 1973 to February 8, 1974, with Skylab remaining in orbit until July 11, 1979.
The (canceled) second production run of Saturn Vs would very likely have used the F-1A engine in its first stage, providing a substantial performance boost.[24] Other likely changes would have been the removal of the fins (which turned out to provide little benefit when compared to their weight); a stretched S-IC first stage to support the more powerful F-1As; and uprated J-2s for the upper stages.
A number of alternate Saturn vehicles were proposed based on the Saturn V, ranging from the Saturn INT-20 with an S-IVB stage and interstage mounted directly onto an S-IC stage, through to the Saturn V-23(L)[25] which would not only have five F-1 engines in the first stage, but also four strap-on boosters with two F-1 engines each: giving a total of thirteen F-1 engines firing at launch.
The Space Shuttle was initially conceived of as a cargo transport to be used in concert with the Saturn V, even to the point that a "Saturn-Shuttle," using the orbiter and external tank, but with the tank mounted on a modified, fly-back version of the S-IC, would be used to power the Shuttle during the first two minutes of flight, after which the S-IC would be jettisoned (which would then fly back to KSC for refurbishment) and the Space Shuttle Main Engines would then fire and place the orbiter into orbit. The Shuttle would handle space station logistics, while Saturn V would launch components. Lack of a second Saturn V production run killed this plan and has left the United States without a heavy-lift booster. Some in the U.S. space community have come to lament this situation, as continued production would have allowed the International Space Station, using a Skylab or Mir configuration with both U.S. and Russian docking ports, to have been lifted with just a handful of launches, with the "Saturn Shuttle" concept possibly eliminating the conditions that caused the Challenger Disaster in 1986.
The Saturn V would have been the prime launch vehicle for the canceled Voyager Mars probes, and was to have been the launch vehicle for the nuclear rocket stage RIFT test program and the later NERVA.
U.S. proposals for a rocket larger than the Saturn V from the late 1950s through the early 1980s were generally called Nova. Over thirty different large rocket proposals carried the Nova name, but none were developed.
Wernher von Braun and others also had plans for a rocket that would have featured eight F-1 engines in its first stage allowing it to launch a manned spacecraft on a direct ascent flight to the Moon. Other plans for the Saturn V called for using a Centaur as an upper stage or adding strap-on boosters. These enhancements would have increased its ability to send large unmanned spacecraft to the outer planets or manned spacecraft to Mars.
In 2006, as part of the cancelled Constellation Program that would have replaced the Space Shuttle, NASA unveiled plans to construct the heavy-lift Ares V rocket, a Shuttle Derived Launch Vehicle using some existing Space Shuttle and Saturn V infrastructure. Named in homage of the Saturn V, the original design, based on the Space Shuttle External Tank, was 360 ft (110 m) tall, and powered by five Space Shuttle Main Engines (SSMEs) and two uprated five-segment Space Shuttle Solid Rocket Boosters, which a modified variation would be used for the crew-launched Ares I rocket. As the design evolved, the Ares V was slightly modified, with the same 33 ft (10 m) diameter as that of the Saturn V's S-IC and S-II stages, and in place of the five SSMEs, five RS-68 rocket engines, the same engines used on the Delta IV EELV, would be used. The switch from the SSME to the RS-68 was due to the steep price of the SSME, as that it would be thrown away along with the Ares V core stage after each use, while the RS-68 engine, which is expendable, is cheaper, simpler to manufacture, and more powerful than the SSME.
In 2008, NASA again redesigned the Ares V, lengthening and widening the core stage and added an extra RS-68 engine, giving the launch vehicle a total of six engines. The six RS-68B engines, during launch, would have been augmented by two "5.5-segment" SRBs instead of the original five-segment designs, although no decision was made on the number of segments NASA would have used on the final design.[26] If the six RS-68B/5.5-segment SRB variant had been used, the vehicle would have had a total of approximately 8,900,000 lbf (40 MN) of thrust at liftoff, making it more powerful than the Saturn V or the Soviet/Russian Energia boosters, but less than 50–43 MN for the Soviet N-1. An upper stage, known as the Earth Departure Stage and based on the S-IVB, would have utilized a more advanced version of the J-2 engine known as the "J-2X," and would have placed the Altair lunar landing vehicle into a low earth orbit. At 381 ft (116 m) tall and with the capability of placing 180 tons into low Earth orbit, the Ares V would have surpassed the Saturn V and the two Soviet/Russian superboosters in both height, lift, and launch capability.
The RS-68B engines, based on the current RS-68 and RS-68A engines built by the Rocketdyne Division of Pratt and Whitney (formerly under the ownerships of Boeing and Rockwell International), produce less than half the thrust per engine as the Saturn V's F-1 engines, but are more efficient and can be throttled up or down, much like the SSMEs on the Shuttle. The J-2 engine used on the S-II and S-IVB would have been modified into the improved J-2X engine for use both on the Earth Departure Stage (EDS) as well as on the second stage of the proposed Ares I. Both the EDS and the Ares I second stage would have used a single J-2X motor, although the EDS was originally designed to use two motors until the redesign employing the five (later six) RS-68Bs in place of the five SSMEs.
In September 2011, NASA announced[27] the Space Launch System (SLS) as the United States' new heavy-lift rocket for manned deep-space exploration, and which will be comparable in size and capabilities to the Saturn V. The new SLS has an upper-stage powered by a J2-X engine derived from the Saturn V launch vehicle, the first stage powered by five liquid-fueled rocket engines derived from the Space Shuttle's main engines, along with two strap-on SRBs also derived from the Shuttle program. The initial configuration of the new booster as proposed by NASA could lift approximately 70 metric tons to LEO, with later variants possibly lifting up to 130 metric tons.
From 1964 until 1973, a total of $6.5 billion ($43.99 billion present day) was appropriated for the Saturn V, with the maximum being in 1966 with $1.2 billion ($8.12 billion present day).[28]
One of the main reasons for the cancellation of the Apollo program was the cost. In 1966, NASA received its biggest budget of US$4.5 billion, about 0.5 percent of the GDP of the United States at that time. In 1969, the cost of a Saturn V including launch was US $ 185 million (inflation adjusted US$ 1.11 billion in 2012).[29]
Serial Number |
Mission | Launch Date |
Notes |
---|---|---|---|
SA-500F | Facilities integration | Used to check precise fits and operations of facilities before a flight model was ready. First stage scrapped, second stage converted to S-II-F/D, third stage whereabouts unknown. |
|
SA-500D | Dynamic testing | Used to evaluate the systems' response to vibrations. On display at the U.S. Space & Rocket Center, Huntsville, Alabama [30] |
|
SA-501 | Apollo 4 | November 9, 1967 | First test flight (unmanned), complete success |
SA-502 | Apollo 6 | April 4, 1968 | Second test flight (unmanned), with some serious second and third stage problems occurring |
SA-503 | Apollo 8 | December 21, 1968 | First manned flight of Saturn V, first manned lunar orbit |
SA-504 | Apollo 9 | March 3, 1969 | Earth orbit LM test |
SA-505 | Apollo 10 | May 18, 1969 | Lunar orbit LM test |
SA-506 | Apollo 11 | July 16, 1969 | First manned lunar landing, at Mare Tranquillitatis |
SA-507 | Apollo 12 | November 14, 1969 | Second manned lunar landing, near site of Surveyor 3 at Mare Cognitum. Vehicle was struck twice by lightning shortly after liftoff with no serious damage. |
SA-508 | Apollo 13 | April 11, 1970 | Severe, near catastrophic pogo oscillations in second stage caused early center engine shutdown. Service Module O2 tank rupture caused mission abort en route to moon, crew saved. |
SA-509 | Apollo 14 | January 31, 1971 | Third manned lunar landing, near Fra Mauro |
SA-510 | Apollo 15 | July 26, 1971 | Fourth manned lunar landing, first Lunar Roving Vehicle, at Hadley-Apennine |
SA-511 | Apollo 16 | April 16, 1972 | Fifth manned lunar landing, at Descartes |
SA-512 | Apollo 17 | December 6, 1972 | Sixth and final manned lunar landing, at Taurus-Littrow. First and only night launch |
SA-513 | Skylab 1 | May 14, 1973 | Two-stage Skylab version (Saturn INT-21). The third stage (S IV-513) was replaced for flight by the Skylab module and is on display at Johnson Space Center.[30] |
SA-514 | Unused | Designated but never used for Apollo 18 or 19. First stage (S-IC-14) on display at Johnson Space Center, second and third stage (S-II-14,S-IV-14) on display at Kennedy Space Center.[30] |
|
SA-515 | Unused | Designated but never used as a backup Skylab launch vehicle. The first stage is on display at Michoud Assembly Facility. The second stage (S-II-15) is on display at Johnson Space Center. The third stage was converted to a backup Skylab orbital workshop and is on display at the National Air and Space Museum.[30] |
|
|
|
|